This review group was raised by SSE on 1st March 2018.
On 18th July a Request for Information (RFI) was circulated to Industry parties with a 20-day consultation window. Interested parties can return an RFI to the Code Administrator by COP Wednesday 15th August 2018. Responses will be discussed at the September Review group.
The Workgroup finalised the Workgroup report on 6th November 2018 and their recommendations referred to the November Panel meeting.
The Panel accepted the Workgroup findings and decided to close the Review group on 21st November 2018
Document Title | Description | Type | Pub Date | Author |
RG004 | Workgroup Report | Adobe PDF | 13/11/2018 | Code Administrator |
RG004 | Way forward Summary | Adobe PDF | 23/10/2018 | Code Administrator |
RG004 | Option 7 background | Adobe PDF | 27/09/2018 | BU-UK |
RG004 | Panel Update | Adobe PDF | 20/09/2018 | Code Administrator |
RG004 | WWU Individual response | Adobe PDF | 30/08/2018 | WWU |
RG004 | Individual responses | Zip File | 28/08/2018 | |
RG004 | Collated Responses | Adobe PDF | 28/08/2018 | Code Administrator |
RG004 | Summary of Responses v1.1 | Adobe PDF | 28/08/2018 | Code Administrator |
RG004 | Request for Information | Word Doc | 18/07/2018 | Code Administrator |
RG004 | Appendix C – Modifications | Adobe PDF | 18/07/2018 | Code Administrator |
RG004 | Appendix B – Attendance | Adobe PDF | 18/07/2018 | Code Administrator |
RG004 | Appendix A – Solutions | Adobe PDF | 18/07/2018 | Code Administrator |
RG004 | Draft RFI | Adobe PDF | 25/06/2018 | Code Administrator |
RG004 | Problem Statement analysis | Adobe PDF | 21/05/2018 | Code Administrator |
RG004 | Driver analysis | Adobe PDF | 24/04/2018 | Code Administrator |
RG004 | Review Group Request | Adobe PDF | 01/03/2018 | SSE |