This Modification was raised by SSE on 5th March 2014 and was considered by the Modification Panel on 19th March 2014.
The Modification Panel determined that the Modification should be sent to Development Workgroup.
The Workgroup Report was presented to the Panel on 20th August 2014. The Panel agreed to circulate for consultation.
The DMR was circulated for consultation on 26th August 2014 with a close out date of 16th September 2014.
The FMR was published on 24th September 2014 for consideration at the Panel meeting on 15th October 2014.
The Panel on 15th October 2014 recommended the Implementation of IGT062, did not recommend the Implementation of IGT062AA and declared no preference between the two Modifications. The Panel recommended an Implementation Date of 27th February 2015. The FMR was sent to Ofgem for Authority Decision on 17th October 2014.
On 20th November 2014, Authority Decision was received to implement IGT062 and not to implement IGT062AA. IGT062 will be implemented on 27th February 2015.
Document Title | Description | Type | Pub Date | Author |
IGT062/AA | Authority Decision | Adobe PDF | 20/11/2014 | |
IGT062/AA | Final Modification Report to Ofgem [Revised] | Adobe PDF | 23/10/2014 | |
IGT062/AA | Final Modification Report to Ofgem | Adobe PDF | 17/10/2014 | |
IGT062/AA | Final Modification Report | Adobe PDF | 24/09/2014 | |
npower | DMR Response | Adobe PDF | 19/09/2014 | |
SSE Energy Supply | DMR Response | Adobe PDF | 17/09/2014 | |
ESP | DMR Response | Adobe PDF | 17/09/2014 | |
Indigo Pipelines | DMR Response (IGT062AA) | Adobe PDF | 17/09/2014 | |
Indigo Pipelines | DMR Response (IGT062) | Adobe PDF | 17/09/2014 | |
EDF | DMR Response | Adobe PDF | 17/09/2014 | |
BUUK | DMR Response (IGT062AA) | Adobe PDF | 17/09/2014 | |
BUUK | DMR Response (IGT062) | Adobe PDF | 17/09/2014 | |
British Gas | DMR Response | Adobe PDF | 17/09/2014 | |
E.ON UK | DMR Response | Adobe PDF | 17/09/2014 | |
IGT062/AA | Draft Modification Report | Adobe PDF | 26/08/2014 | |
IGT062 | Modification Proposal (CURRENT) | Adobe PDF | 19/08/2014 | |
IGT062 | Modification Proposal following Workgroup | Adobe PDF | 30/07/2014 | |
IGT062 | Workgroup Report | Adobe PDF | 30/07/2014 | |
IGT062 | Chairman’s Guidelines | Adobe PDF | 25/06/2014 | |
IGT062 | Sub Group ToR | Adobe PDF | 25/06/2014 | |
IGT062 | Legal Text Matrix | Adobe PDF | 25/06/2014 | |
IGT062 | Change Marked Legal Text | Adobe PDF | 23/06/2014 | |
IGT062 | IGT062 Modification Amended (Change Marked) | Adobe PDF | 14/05/2014 | |
IGT062 | IGT062 Modification Amended (Clean) | Adobe PDF | 14/05/2014 | |
IGT062 | DG02 Minutes | Adobe PDF | 29/05/2014 | |
IGT062 | DG02 Agenda | Adobe PDF | 07/05/2014 | |
IGT062 | DG01 Minutes | Adobe PDF | 29/05/2014 | |
IGT062 | DG01 Agenda | Adobe PDF | 02/04/2014 | |
IGT062 | Draft Terms of Reference | Adobe PDF | 02/04/2014 | |
IGT062 | Modification Proposal | Adobe PDF | 05/03/2014 |