This Modification was raised by eon energy on 5th June 2013.
The Draft Final Modification Report was considered at the October Modification Panel, and following immaterial amendments raised by Ofgem was agreed ex-committee.
The Final Modification Report has now been published and on 18th October 2013 was sent to Ofgem for consideration.
Ofgem notice to implement was received on 25th November 2013. The Modification is to be implemented in an extraordinary release of the IGT UNC on 20th December 2013.
Document Title | Description | Type | Pub Date | Author |
IGT 052 | Authority Notice to Implement | Adobe PDF | 26/11/2013 | |
IGT 052 | Final Modification Report | Adobe PDF | 18/10/2013 | |
IGT 052 | Appendix 1 Revised | Adobe PDF | 18/10/2013 | |
IGT 052 | Appendix 2 Revised | Adobe PDF | 18/10/2013 | |
SSE Supply | DMR Consultation Response | Adobe PDF | 19/09/2013 | |
npower | DMR Consultation Response | Adobe PDF | 19/09/2013 | |
IGT052 | Draft Final Modification Report | Adobe PDF | 02/10/2013 | |
EON Energy UK | DMR Consultation Response | Adobe PDF | 16/09/2013 | |
Scottish Power | DMR Consultation Response | Adobe PDF | 18/09/2013 | |
British Gas | DMR Consultation Response | Adobe PDF | 16/09/2013 | |
ESP | DMR Consultation Response | Adobe PDF | 16/09/2013 | |
IGT052 | DMR: Revision to the Modification Rules in Response to CGR2 v3 | Adobe PDF | 28/08/2013 | |
IGT052 | Appendix 1 | Adobe PDF | 28/08/2013 | |
IGT052 | Appendix 2 | Adobe PDF | 28/08/2013 | |
IGT052 | Appendix 3 | Adobe PDF | 28/08/2013 | |
IGT052 | CGR2 Section L Mod Process Proposed Changes v1 0 | Adobe PDF | 20/08/2013 | |
IGT052 | IGT052 Workgroup Report Final Version – Change Marked | Adobe PDF | 20/08/2013 | |
IGT052 | Terms of Reference draft | Adobe PDF | 21/06/2013 | |
IGT052 | CGR2 Section L Mod Process Proposed Changes v3 | Adobe PDF | 21/06/2013 | |
IGT052 | Modification Proposal | Adobe PDF | 05/06/2013 | |
IGT052 | CGR2 Section L Mod Process Proposed Changes v1 | Adobe PDF | 19/06/2013 |