- Raised by E.ON on 13th June 2017
- Modification Proposal developed at Workgroup on 4th July 2017
- Draft Modification sent out for Consultation 20th July 2017
- Consultation Close out on 11th August 2017
- Final Modification report considered by Panel on 16th August 2017
- Modification passed for implementation on 16th August 2017 to be included in the November Code release
Document Title | Description | Type | Pub Date | Author |
IGT100 | Notice of Implementation | Adobe PDF | 17/08/2017 | Code Administrator |
IGT100 | Post Panel FMR | Adobe PDF | 29/08/2017 | Code Administrator |
IGT100 | Pre-Panel FMR | Adobe PDF | 11/08/2017 | Code Administrator |
IGT100 | Consultation responses | Zip Archive | 11/08/2017 | |
IGT100 | Draft Modification Report | Adobe PDF | 20/07/2017 | Code Administrator |
IGT100 | Workgroup Report | Adobe PDF | 11/07/2017 | E.ON |
IGT100 | Modification Proposal v2.0 | Adobe PDF | 11/07/2017 | E.ON |
IGT100 | Modification Proposal | Adobe PDF | 13/06/2017 | E.ON |