The Modification was raised by npower on the 13th July 2012.
The Modification was considered at the August 2012 Modification Panel, where the Panel agreed to send it to consultation.
The Draft Final Modification Report for this Modification Proposal was sent out for consultation on 12th November 2012. The DFMR was considered at November’s Modification Panel, were the Panel recommended implementation.
Ofgem approved the Final Modification Report on 20th December 2012.
This Modification Proposal was implemented on 28th June 2013.
Document Title | Description | Type | Pub Date | Author |
IGT048 | Authority Decision | Adobe PDF | 20/12/2012 | |
IGT048 | Final Modification Report | Adobe PDF | 22/11/2012 | |
IGT048 | Draft Final Modification Report | Adobe PDF | 12/11/2012 | |
Fulcrum Pipelines | DMR Consultation Response | Adobe PDF | 02/10/2012 | |
IGT048 | Draft Modification Report | Adobe PDF | 01/10/2012 | |
IGT048 | Modification Proposal | Adobe PDF | 17/08/2012 | |
Independent Pipelines Limited | Consultation response | Adobe PDF | 11/09/2012 | |
GTC | Consultation Response | Adobe PDF | 19/09/2012 | |
British Gas | Consultation response | Adobe PDF | 10/09/2012 | |
Npower | Consultation response | Adobe PDF | 10/09/2012 | |
Scottish Power | Consultation response | Adobe PDF | 10/09/2012 | |
ESP | Consultations response | Adobe PDF | 10/09/2012 | |
E.On | Consultation response | Adobe PDF | 10/09/2012 | |
EDF | Consultation response | Adobe PDF | 10/09/2012 | |
SSE Pipelines | Consultation response | Adobe PDF | 10/09/2012 | |
SSE Supply | Consultation response | Adobe PDF | 10/09/2012 |