The Modification was raised by E.ON Energy on the 1st February 2012.
The Modification was discussed at the February Modification Panel on the 15th February, where the Panel directed the Modification to Development.
The last Modification Development Group was held on Wednesday 24th October at 10am, at E.ON’s offices. Please see notes below for details.
This Modification was sent out to consultation following the December Panel meeting.
The Authority Decision for this Modification Proposal is available below. This Modification will be implemented in the November 2013 IGT UNC release.
Document Title | Description | Type | Pub Date | Author |
IGT046 | Authority Decision | Adobe PDF | 25/07/2013 | |
IGT046 | Final Modification Report – revised | Adobe PDF | 19/06/2013 | |
IGT046DG | Section L Modification process v5 | Adobe PDF | 14/06/2013 | |
IGT046DG | Section L Modification process v5 change marked | Adobe PDF | 14/06/2013 | |
IGT046 | Final Modification Report | Adobe PDF | 19/04/2013 | |
IGT046 | Draft Final Modification Proposal | Adobe PDF | 20/03/2013 | |
Scottish Power | DMR Consultation Response | Adobe PDF | 13/03/2013 | |
IGT046 | Draft Modification Report | Adobe PDF | 06/02/2013 | |
ESP | Consultation Response | Adobe PDF | 06/02/2013 | |
RWE npower | Consultation Response | Adobe PDF | 06/02/2013 | |
British Gas | Consultation Response | Adobe PDF | 06/02/2013 | |
E.ON | Consultation Response | Adobe PDF | 06/02/2013 | |
IGT046DG | Modification Proposal | Adobe PDF | 21/12/2012 | |
IGT046DG | Section L Modification process v0.3 | Adobe PDF | 19/12/2012 | |
IGT046DG | Standard Modification Proposed process | Adobe PDF | 19/12/2012 | |
IGT046DG | Workgroup Report Final Version | Adobe PDF | 05/12/2012 | |
IGT046DG | Working Group notes | Adobe PDF | 02/11/2012 | |
IGT046DG | Proposed Process | Adobe PDF | 17/10/2012 | |
IGT046DG | Section L – Proposed Mod Changes | Adobe PDF | 17/10/2012 | |
IGT046DG | Meeting 2 Minutes | Adobe PDF | 03/08/2012 | |
IGT046DG | Directions to E.ON offices – 25th July | Adobe PDF | 11/07/2012 | |
IGT046DG | Approved Terms of Reference | Adobe PDF | 20/04/2012 | |
IGT046DG | Development Group Meeting 1 Agenda, revised Draft ToR and Draft Minutes | Zip Archive | 11/04/2012 | |
IGT046 | IGT UNC & UNC Modification Rules Comparison | Word Document (Office 97-2003) | 09/03/2012 | |
IGT046 | Modification Proposal | Adobe PDF | 01/02/2012 |