This Modification was raised by E.ON UK on 24th September 2010. The Draft Final Modification Report (DFMR) was presented at the February Modification Panel where the Proposal was unanimously recommended for implementation. The Final Modification Report (FMR) was published on the 23rd February 2011.
The Authority directed on the 30th March 2011 that the Modification be implented. The Modification will be implemented in the November release of the IGT UNC.
Document Title | Description | Type | Pub Date | Author |
---|---|---|---|---|
IGT032 | Authority Decision | Adobe PDF | 30/03/2011 | |
IGT032 | Final Modification Report | Adobe PDF | 23/02/2011 | |
IGT032 | Draft Final Modification Report | Adobe PDF | 18/01/2011 | |
IGT032 | npower DMR Consultation Response | Adobe PDF | 29/12/2010 | |
IGT032 | Draft Modification Report | Adobe PDF | 03/12/2010 | |
IGT032 | EDF Energy Consultation Response | Adobe PDF | 03/12/2010 | |
IGT032 | Fulcrum Consultation Response | Adobe PDF | 03/12/2010 | |
IGT032 | GTC Consultation Response | Adobe PDF | 03/12/2010 | |
IGT032 | Scottish Power Consultation Response | Adobe PDF | 03/12/2010 | |
IGT032 | Consultation Response Template | Word Document (Office 97-2003) | 22/10/2010 | |
IGT032 | SSE Consultation Response | Adobe PDF | 03/12/2010 | |
IGT032 | SSE Pipelines Consultation Response | Adobe PDF | 03/12/2010 | |
IGT032 | Modification Proposal | Adobe PDF | 28/09/2010 |