IGT172 – Provision for gas entry within the IGT UNC

  • IGT172 raised by Barrow Shipping on 20th October 2023.
  • On 27th October 2023 the IGT UNC Panel agreed to send this Modification to the November 2023 IGT UNC Workstream.
  • On 30th April 2023 the Panel considered the Final Modification Report and agreed a recommendation to the Authority that IGT172 should be implemented.
  • This Modification is currently with the Authority for decision.
Document Description Document Type Author Date
IGT172 Final Modification Report (V1.0, Post Panel) Adobe PDF Code Administrator 30/04/2024
IGT172 Ixora Energy Ltd Consultation Response Adobe PDF Ixora Energy Ltd 23/04/2024
IGT172 Final Modification Report (V1.0, Pre-Panel) Adobe PDF Code Administrator 19/04/2024
IGT172 SGN Consultation Response Adobe PDF SGN 19/04/2024
IGT172 Grissan Renewable Energy Consultation Response Adobe PDF Grissan Renewable Energy 19/04/2024
IGT172 CNG Services Ltd Consultation Response Adobe PDF CNG Services Ltd 19/04/2024
IGT172 Ceres Energy Consultation Response Adobe PDF Ceres Energy 19/04/2024
IGT172 Barrow Shipping Consultation Response Adobe PDF Barrow Shipping 19/04/2024
IGT172 Green Forty Development Ltd Consultation Response Adobe PDF Green Forty Development Ltd 19/04/2024
IGT172 Indigo Pipelines Consultation Response Adobe PDF Indigo Pipelines 19/04/2024
IGT172 BUUK Consultation Response Adobe PDF BUUK 19/04/2024
IGT172 Consultation Template Microsoft Word Code Administrator 22/03/2024
IGT172 Draft Modification Report v1.0 Adobe PDF Code Administrator 22/03/2024
IGT172 Draft Legal Text v1.0 Adobe PDF Code Administrator 22/03/2024
IGT172 Workgroup Report Adobe PDF Code Administrator 15/03/2024
IGT172 IGT UNC (V13.15) – Mark up (23 January 2024) Adobe PDF Barrow Shipping 29/01/2024
IGT172 Draft Working Legal Text -Tracked Changes to the IGT UNC in TPD Section I v2.0 Adobe PDF Barrow Shipping 23/01/2024
IGT172 Draft Legal Text – Explanatory Table v2.0 Adobe PDF Barrow Shipping 23/01/2024
IGT172 Amended Modification Proposal (v4.0, Clean) Adobe PDF Barrow Shipping 27/12/2023
IGT172 Amended Modification Proposal (v4.0, Tracked) Adobe PDF Barrow Shipping 27/12/2023
IGT172 IGT172 – Central Impacts Adobe PDF Xoserve 22/12/2023
IGT172 Draft Working Legal Text -Tracked Changes to the IGT UNC in TPD Section I v1.0
Adobe PDF Barrow Shipping 22/12/2023
IGT172 Draft Legal Text – Explanatory Table v1.0 Adobe PDF Barrow Shipping 22/12/2023
IGT172 Amended Modification Proposal (v3.0, Clean) Adobe PDF Barrow Shipping 30/11/2023
IGT172 Amended Modification Proposal (v3.0, Tracked) Adobe PDF Barrow Shipping 30/11/2023
IGT172 Amended Modification Proposal (v2.0, Clean) Adobe PDF Barrow Shipping 06/11/2023
IGT172 Amended Modification Proposal (v2.0, Tracked) Adobe PDF Barrow Shipping 06/11/2023
IGT172 Draft Modification Proposal Adobe PDF Barrow Shipping 20/10/2023