This Modification was raised by ESP on 4th September 2013.
The Draft Final Modification Report was agreed by the Modification Panel on 18th December 2013.
The Final Modification Report was sent to Ofgem on 20th December 2013.
The Authority Decision to Implement was received on 5th February 2014.
IGT055 will be implemented on 27th June 2014.
Document Title | Description | Type | Pub Date | Author |
IGT055 | Authority Decision | Adobe PDF | 06/02/2014 | |
IGT055 | Final Modification Report | Adobe PDF | 20/12/2013 | |
IGT055 | Draft Final Modification Report | Adobe PDF | 06/12/2013 | |
IGT055 | Draft Modification Report | Adobe PDF | 01/11/2013 | |
IGT055 | Modification Proposal | Adobe PDF | 04/09/2013 | |
British Gas | Consultation Response | Adobe PDF | 11/10/2013 | |
RWE npower | Consultation Response | Adobe PDF | 11/10/2013 | |
EON Energy UK | Consultation Response | Adobe PDF | 11/10/2013 | |
SSE Supply | Consultation Response | Adobe PDF | 11/10/2013 | |
Scottish Power | Consultation Response | Adobe PDF | 11/10/2013 |