This Modification was raised by GTC on the 18th October 2012 as an alternative to IGT050 – IGT and Shipper Metering Communications Ancillary Document.
The Modification Proposal is to be reviewed in line with the associated Ancillary Document amendments (within the document below).
This Modification was considered at the November 2012 Modification Panel.
The Final Modification Report (FMR) was considered at March’s (2013) Panel meeting.
The Panel will determine considered an amendment to the Ancillary Document as Short Notice Business at the February (2014) Panel.
The Panel agreed to send the Ancillary Document out for consultation with a shortened window. The Consultation closed on 3rd April 2014.
A special Modification Panel on 4th April 2014 determined that the implementation (original agreed for 27th June 2014) should be deferred until 1st October 2014.
Version 6.0 of the Ancillary Document was published on 9th April 2014, following industry feedback.
The Modification Panel on 16th April 2014 agreed the final version (v6.0) of the Ancillary Document.
Document Title | Description | Type | Pub Date | Author |
IGT050A | Ancillary Document v6.0 Clean | Adobe PDF | 09/04/2014 | |
IGT050A | Ancillary Document v6.0 Change Marked | Adobe PDF | 09/04/2014 | |
IGT050A | [Historic] Ancillary Document v5.0 Changemarked | Adobe PDF | 04/04/2014 | |
SSE Supply | v4.0 Consultation Response | Adobe PDF | 04/04/2014 | |
npower | V4.0 Consultation Response | Adobe PDF | 04/04/2014 | |
IGT050A | [Historic] Ancillary Document v4.0 | Adobe PDF | 20/03/2014 | |
IGT050A | [Historic] Ancillary Document v3.0 | Adobe PDF | 18/03/2014 | |
IGT050A | Summary of Responses | Adobe PDF | 18/03/2014 | |
Ancillary | ESP Consultation Response | Adobe PDF | 12/03/2014 | |
Ancillary | E.ON Consultation Response | Adobe PDF | 12/03/2014 | |
Ancillary | SSE Energy Consultation Response | Adobe PDF | 12/03/2014 | |
IGT050A | Ancillary Consultation | Adobe PDF | 20/02/2014 | |
Ancillary | [Historic] Clean (v2.0) | Adobe PDF | 20/02/2014 | |
Ancillary | [Historic] Change Marked (v2.0) | Adobe PDF | 20/02/2014 | |
Ancillary | [Historic] Clean v6.0 | Adobe PDF | 17/02/2014 | |
Ancillary | [Historic] Change Marked v6.0 | Adobe PDF | 17/02/2014 | |
IGT050A | Authority Decision | Adobe PDF | 01/05/2013 | |
IGT050A | Final Modification Report | Adobe PDF | 22/03/2013 | |
GTC | DMR Consultation Response | Adobe PDF | 30/01/2013 | |
E.On | DMR Consultation Response | Adobe PDF | 05/02/2013 | |
IGT050A | Draft Final Modification Report | Adobe PDF | 20/02/2013 | |
SSE | DMR Consultation Response | Adobe PDF | 05/02/2013 | |
IGT050A | Draft Modification Report | Adobe PDF | 09/01/2013 | |
ESP | Consultation Response | Adobe PDF | 14/12/2012 | |
Inexus | Consultation Response | Adobe PDF | 18/12/2012 | |
EDF | Consultation Response | Adobe PDF | 17/12/2012 | |
British Gas | Consultation Response | Adobe PDF | 14/12/2012 | |
SSE | Consultation Response | Adobe PDF | 18/12/2012 | |
Npower | Consultation Response | Adobe PDF | 14/12/2012 | |
SSE Pipelines | Consultation Response | Adobe PDF | 14/12/2012 | |
Scottish Power | Consultation Response | Adobe PDF | 14/12/2012 | |
E.On | Consultation Response | Adobe PDF | 14/12/2012 | |
GTC Pipelines Ltd | Consultation Response | Adobe PDF | 11/12/2012 | |
IGT050A | Alternative Modification Proposal | Adobe PDF | 22/10/2012 | |
IGT050A | Ancillary Document | Adobe PDF | 23/10/2012 |