The Modification was raised by E.ON UK on the 28th July.
At the December Modification Panel, the Modification was recommended for implementation. The Final Modification Report was sent to Ofgem on the 30th December 2011 for an Authority decision.
On the 2nd February 2012, the Authority directed that IGT040V be implemented. The Authority also agreed with the Panel recommendation that implementation be not less than four months from Authority direction. IGTs have approved an implementation within the June 2012 release of the IGT UNC.
Document Title | Description | Type | Pub Date | Author |
---|---|---|---|---|
IGT037 | Authority Decision | Adobe PDF | 03/02/2012 | |
IGT037 | Proposed/Draft Ancillary Document | Word Document (Office 97-2003) | 30/12/2011 | |
IGT037 | Final Modification Report | Adobe PDF | 30/12/2011 | |
IGT037 | Draft Final Modification Report | Adobe PDF | 15/11/2011 | |
IGT037 | npower DMR Consultation Response | Adobe PDF | 25/10/2011 | |
IGT037 | IPL/QPL DMR Consultation Response | Adobe PDF | 25/10/2011 | |
IGT037 | Draft Modification Report | Adobe PDF | 04/10/2011 | |
IGT037 | British Gas Consultation Response | Adobe PDF | 23/09/2011 | |
IGT037 | GTC Consultation Response | Adobe PDF | 23/09/2011 | |
IGT037 | Scottish Power Consultation Response | Adobe PDF | 23/09/2011 | |
IGT037 | Other Responses (regarding specific fax/email information request) | Adobe PDF | 23/09/2011 | |
IGT037 | Modification Proposal | Adobe PDF | 28/07/2011 | |
IGT037 | Fax Forms – Larger Supply Points | Excel Spreadsheet (Office 97-2003) | 28/07/2011 | |
IGT037 | Fax Form – Smaller Supply Points | Excel Spreadsheet (Office 97-2003) | 28/07/2011 |