This Modification was raised by ES Pipelines on 2nd March 2011. The Draft Final Modification Report was published on the 16th June 2011 and will be presented to the July Modification Panel.
The Authority directed on the 25th August 2011 that the Modification be implented. The Modification will be implemented in the November release of the IGT UNC.
Document Title | Description | Type | Pub Date | Author |
---|---|---|---|---|
IGT034 | Final Modification Report | Adobe PDF | 27/07/2011 | |
IGT034 | Authority Decision | Adobe PDF | 25/08/2011 | |
IGT034 | Draft Final Modification Report | Adobe PDF | 16/06/2011 | |
IGT034 | Draft Modification Report | Adobe PDF | 04/05/2011 | |
IGT034 | E.ON Energy Response | Adobe PDF | 27/04/2011 | |
IGT034 | npower Consultation Response | Adobe PDF | 12/04/2011 | |
IGT034 | Scottish Power Consultation Response | Adobe PDF | 12/04/2011 | |
IGT034 | SSE Pipelines Consultation Response | Adobe PDF | 12/04/2011 | |
IGT034 | GTC Consultation Response | Adobe PDF | 12/04/2011 | |
IGT034 | Modification Proposal | Adobe PDF | 02/03/2011 |