The Modification was raised by GTC on the 1st May 2012. The Modification was issued for Consultation on 18th May, with a closing date for responses of 12th June 2012.
The Draft Modification Report (DMR) was released on the 3rd July 2012, with a closing date for responses of 24th July 2012.
The Final Modification Report was sent to Ofgem for decision on 26th September – with the Authority directing the implementation of this Modification.
This Modification will be implemented in the February 2013 release of the IGT UNC.
Document Title | Description | Type | Pub Date | Author |
---|---|---|---|---|
UGI038/GTC0347/GPL047 | Authority decision | Adobe PDF | 25/10/2012 | |
UGI038/GTC0347/GPL047 | Final Modification Report | Adobe PDF | 26/09/2012 | |
UGI038/GTC0347/GPL047 | Draft Final Modification Report | Adobe PDF | 14/08/2012 | |
UGI038/GTC0347/GPL047 | Consultation Response | Adobe PDF | 06/08/2012 | |
UGI038/GTC0347/GPL047 | Draft Modification Report | Adobe PDF | 03/07/2012 | |
UGI038/GTC0347/GPL047 | Modification Proposal | Adobe PDF | 18/05/2012 |